Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations IRstuff on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. mts301

    Subsea Pipeline Flooding

    LittleInch, Thank you for the reply. I am doing everything topsides thru coil tubing but the initial free flood is subsea and the bleed off of the nitrogen will be subsea as well. Flooding thru 2" opening and nitrogen going out a 3/8" u-tube at the other end. Please see sketch attached...
  2. mts301

    Subsea Pipeline Flooding

    Looking for some help on pipeline calcs for a free flood, only difference is the pipeline has 1300 psi of nitrogen in it. Flooding plet to plet. Elev is 7000 and 6000. subsea ambient temp is ~40 F, 6" pipeline. I am trying to calculate the rate at which the nitrogen will start to be...

Part and Inventory Search