    Concrete Slab Point Load vs Articulating Boom Load

    thank you jayrod12. I will ask him to calculate it based on the specifications of the machine
  2. haztorgan

    Concrete Slab Point Load vs Articulating Boom Load

    We are building a 2 story mall with underground parking. The structural engineer told me that the poured concrete slabs of level 1 and level 2 are capable of holding taking 35kN or 7850lbs point load. "The maximum point load allowed on the floor will be 35kN or 7850lb without revising the...