I have a project where the PV panels are rated to be walked on. So I wouldn't throw-out the live load. Also, on Pre-Engineered Metal Buildings, even though the dead load from PV and the racking system is about 4 psf, it's still kicking off the IBC requirements. So be aware of this when dealing...