  1. TVM90

    Extend Footer To Accommodate Anchor Bolt Edge Distance

    Thanks for all of the responses. The footing is 4'-0" x 8'-6" x 24" thick. I've been using Hilti's design tables so I am not sure what is controlling the design. My suspicion is concrete breakout capacity is insufficient due to the limited edge distance. I don't think the breakout cone is large...
  2. TVM90

    Extend Footer To Accommodate Anchor Bolt Edge Distance

    So things didn't go as planned on this project. Somehow the location of a large concrete footer was set incorrectly. Instead of moving the footer or re-pouring it the contractor and steel erector opted to cut the anchor bolts and epoxy in new ones. The columns eccentricity on the footer is 7" in...
  3. TVM90

    Snow Drift On Adjacent Varying Height Parapet Walls

    Thanks for the response JAE, Is the solution you proposed a sort of engineering judgment or can it be found in literature or reference material?
  4. TVM90

    Snow Drift On Adjacent Varying Height Parapet Walls

    I have a situation that I haven't run into before and can't seem to find any literature on. Is anyone aware of any guidance that might exist in the design of snow drifts on adjacent parapet walls that vary in height? What I have is an existing parapet wall that is being extended by 32" for a...