Thanks @ Georgeverghese & don1980.
@GeorgeVerghese - Its bit strange, I agree but our situation was like this -
1. We already had a system in place with WSE (written scheme of examination) at MAWP -11.3 barg. The site operating pressure is at 9.5-10 barg.
2. We had to remove one of the...
Thanks @ georgeverghese & Don1980.
Your replies are very useful. I am trying to re-route the pipe so that I have around 10 dia stratight run before the Relief Valve. However, I am interested to know whether there is any guidance that restricts the current proposed location or is the proposed...
Hi Gentlemen,
I have a question related to PRV Inlet Piping. I have to install a relief valve on the steam supply pipe from the steam turbine tapping to a header rated at 11.3 barg. We have two parallel steam paths from turbine that converge and run as a single pipe to join the steam header. We...