Redacted drawing and inspection versions now attached.http://files.engineering.com/getfile.aspx?folder=ba4bf258-1704-4f8b-b662-f0bba1631a02&file=Binder1_Redacted.pdf
Thank you, Gents, for your interest and detailed responses.
Please keep it up - this remains an active issue.
[Yes, should have redacted the attachments to remove the company names. Would do so now, but I'm not finding a message edit capability yet]
Thanks again
Questions abound on this piece.
Please see attachment.
The red line detail is the metrology lab mark-up. Page 2 is the measurement results using a vision system, rather than the drawing note # 6 Since bar method.
Your input as to accuracy of the drawing - conflicting datum's or not? And, as...