Sampling requirements for dredging projects in the US are controlled by different regulatory programs. These include the inland testing manual: http://www.epa.gov/ost/itm/itmpdf.html In the Northwest (US; Washington, Oregon, and Idaho), testing of dredge material is regulated by the Dredged...
I'm setting up a calendar in MS Project and want to show the holidays as non-working days, but have labels on those days as shown in the Calendar view. Anybody know how to do this, or if it can be done?
Thanks
BMcD