The size of the facility I am working on is about 6 Mega-Watts. Not super huge, but not exactly tiny either.
It is definitely B31.1.
BIMR, thanks for the clarification of the frequency of stress analysis. I am thinking the same thing. However, I am always curious about nozzle checks on pumps...
I am gutting and re-installing new power generators and piping in a waste heat recovery system. Quite a large job. Everything is ASME b31.1 flanged steel piping. Not much will be threaded.
The drawings are only piping plans for now. The contractor is procuring all the equipment besides the...
Thx pennpiper.
It just seems so "half a$$" in some ways. I am reading on sections drawings now and it seems there will be so many them needed, why these industries still use 2D is beyond me. This is just OLD SCHOOL.
Calling out all this stuff, and them modeling in Caesar II. Sheesh. I would...
Hello everyone,
I am stepping out of Oil and Gas and into Water. Long story short, I know pipe stress and supporting on racks etc from the Oil and Gas, but switching to water, I am now on B31.1 code and the use of hangers, rods, trapezes, etc.
I can fundamentally perform the stress analysis...