Thank you all for the input.
I agree that the best method would be experimental.
Some more background on this, the application is for roofing sheets and the bitumen will be mated with fiberglass for rigidity. The fiberglass rolls are past through a bitumen tank and than scrubbed to desired...
This would be for indoor production, and can be in a temperature controlled environment. Also, I am planning a water cooling and re-circulation system to apply water directly to the bitumen sheeting. I am trying to identify the length of this system, so I would like to take into account worst...
Hello All,
I am working on a conceptual design of a fibreglass roofing manufacturing automation equipment. The fibreglass is mated using Bitumen and will be cut into sheets. Prior to cutting the material I have to allow for cooling/hardening, the target is to get from 100 Celsius to between...