Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations LittleInch on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. MeteringSystems

    Modifications after hydrostatic test - Piping System

    DekDee, link won´t open because that thread is already closed. That´s my point of view, not hydro retesting is needed just a Tightness Test as indicated in ASME PCC-2. It is a customer requirement to perform a hydrotest again, but it is not in contract terms. thanks for your comment!
  2. MeteringSystems

    Modifications after hydrostatic test - Piping System

    thread292-210727 I was reading a closed thread related to what type of test should be perform on a piping systems if it is modified after the hydrotest. I work on metering systems design, currently I have an issue in one of my projects with the client. There was a problem during transportation...

Part and Inventory Search

Back
Top