June 21, 2013
Dear All,
I was called by the owner of a candy factory to repair their 150 Bhp Ray Boiler manufactured in 1999 with a maximum design pressure of 150 psig. Their boiler operates at a maximum of 100 psi and uses bunker fuel. It is a three pass boiler which had some leaking tubes at...