Thanks to you all for your thoughts. Multiple lines of inquiry have pointed to the hydrotest. The wall thickness varies at the different points we have checked. We have also replaced vacuum release valves.
Has anyone ever rerounded HDPE pipe after a vacuum collapse? I have a 4"/8" dual-contained HDPE force main. The 4" pipe collapsed, apparently after a vacuum release valve failure. I am exploring options to complete replacement of the pipe.