Thanks Ron,
Until now I have been calculating the I value of both the concrete (35N)and the steel casing (100yr residual thickness), and calculating Pcrit seperately for each, summing the values to give a Pcrit for the whole pile.
The Piles will be driven through 18m of Alluvial Silt, into...