Hi, I’m currently working as an intern at a bottling company and have been asked to do a feasibility study on a 1000 kg/h CO2 (beverage grade) plant.
The most attractive options have been identified as follow:
1) Recovering the CO2 from flue gas from either of the two boilers currently at the...