Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: allanex50
  • Content: Threads
  • Order by date
  1. allanex50

    Expansion joint thru structural slab connecting pile caps?

    Our building is designed to have expansion joint. Part of structural slab is connecting to pile caps. And also, the said slab will become our basement floor. Is it safe that expansion joint will cut thru the slab joining the pile caps which is essentially part of the foundation? Our design...
  2. allanex50

    Is mechanical ducting allowed to pass thru shear wall?

    Our 4-story bdg. is provided with shear wall designed to resist lateral loads as earthquake. Our mechanical department wants to pass a pipe ducting about 800mm in diameter thru the shear wall. However, I did not allow to do it so. Is there any reference structural codes to prohibit the opening...
  3. allanex50

    MAX ACCEPTABLE SLUMP FOR CONGESTED COLUMN?

    WE ARE USING PLASTICIZER FOR WORKABILITY OF CONCRETE POURING BUT OUR DESIGN MIX SPECIFIED SLUMP NOT TO EXCEEDS 150mm FOR COLUMNS AND BEAMS. HOWEVER, SUCH SLUMP DOES NOT WORK PROPERLY RESULTING ONLY TO HONEYCOMB. CAN WE ADJUST THE SLUMP UP TO 200mm? Please any expert can give me advise on...
  4. allanex50

    Broken Concrete Footing Can Being Repaired?

    Proposed 4-story Building is supported by isolated footing rest on Bored Piles. A newly concrete footing was found to be inadequate due to low strength test results, so the consultant decided to remove the concrete. However, our project manager refused to do so, instead, he proposes to remove...

Part and Inventory Search