The above referenced code, Paragraph (b) states that "when pipe that has been cold worked for meeting the specified minimum yield strength is subsequently heated to a temperature higher than 900 degrees F (482 degrees C) for any period of time or over 600 degrees F (316 degrees C) for more than...
I am trying to source some vertical can pumps for a low pressure NGL handling operation and am getting lead times of 26-30 weeks. The specs are as follows:
Liquids = Hydrocarbons
Flow = 300 US GPM
Pump Temp = 58 degrees F - 84 degrees F
Specific Gravity = 0.5485
Vapor Press = 763.1
Viscosity =...