Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: JmanTexas
  • Content: Threads
  • Order by date
  1. JmanTexas

    Gas feedstock for 2500 tpd methanol plant

    What is the natural gas feedstock requirement for a 2,500 TPD Methanol Plant.
  2. JmanTexas

    ASME B31.8.1.4

    The above referenced code, Paragraph (b) states that "when pipe that has been cold worked for meeting the specified minimum yield strength is subsequently heated to a temperature higher than 900 degrees F (482 degrees C) for any period of time or over 600 degrees F (316 degrees C) for more than...
  3. JmanTexas

    Vertical Can Pump Lead Times

    I am trying to source some vertical can pumps for a low pressure NGL handling operation and am getting lead times of 26-30 weeks. The specs are as follows: Liquids = Hydrocarbons Flow = 300 US GPM Pump Temp = 58 degrees F - 84 degrees F Specific Gravity = 0.5485 Vapor Press = 763.1 Viscosity =...

Part and Inventory Search