  1. DCMV

    When performing weave technique on

    When performing weave technique on pipe weld per the WPS is there a code specific on max of how wide the weave can be in a single pass using GTAW process? I can not find in any ASME or API code. I would think that as long as you keep your machine settings in the parameters of the WPS, it...
  2. DCMV

    We are splicing column to top of ex

    We are splicing column to top of existing column full pin welds what type of load would that beregarding RT acceptacne criteria per D1.1. The column have a flange of .5" and welding with E7018.
  3. DCMV

    Structural welding

    when welding structural beams to existing structure such as pipe rack will ASME sect 9 WPS and PQR be acceptable or is AWS WPS have to be used. In Texas.
  4. DCMV

    New ASME editions

    The latest ASME edition is 2015. We have a shop using 2013 edition. When should the 2015 ASME Sect VIII be implemented.
  5. DCMV

    F#

    Hello, I need some help understanding filler metal change on WPS from what I understand if you stay within the same F# on WPS you would not need a new WPS. Example, changing filler metal from ER70S-2 to ER70S-6 on a WPS the F# is the same but the A number is not. Per ASME would this be allowed...
  6. DCMV

    Jurisdiction

    What Jurisdiction whould driving piling for Dock plateform, what code would the piling be under and what code would the structure be covered under.
  7. DCMV

    Multiply Repair Organization

    We had contractor A start replacing some tubes on a Steam boiler, contractor A did not finish the repairs (had to leave plant unexpectedly) and a sister company of contractor A with their own R stamp is going to complete the tube replacement. My questions are how should that be handled as far as...
  8. DCMV

    Hardness Testing

    We are building a carbon steel pipe spool piece that requires elavated preheat in lieu of PWHT, with required preheat tempature of 350 degrees and Hardness testing with max reading of 200, I would like to know if the BNH readings have to be complete on all the welds including the shoe to pipe...
  9. DCMV

    PQR

    Got a question to clarify when PWHT is required. B3.3 requires pwht for material over .750", so can a PQR per ASME sect IX have been done on a plate 1.5" thk. Without pwht and can a WPS use this PQR for a max thk of 8" without PWHT.
  10. DCMV

    NBIC

    Is there a requirement per NBIC on facsimile/rub of the original data plate to be in the code package after completing a coded vessel repair.
  11. DCMV

    bolts/nuts

    Is there any asme code that specifies which way the nut has to be on a bolt, is there such thing as a backword/upside down nut? I know the material/grade should be showing when checking a bolt up connection. I'm just wondering if 1 nut out of 45 is backword (not showing 2H) is this good reason...
  12. DCMV

    WPQ

    I need help to understand the statement made in ASME Sect IX it basically states that If a welder or welding operator qualifies in combination on a single test coupon the welder can weld in production any of his single processes or combination of his processes. So if he completed a 2" sch160 in...
  13. DCMV

    Grinding after hydro

    We are building a new pressure vessel per ASME Sect VIII Div 1. We have completed the vessel and pressure tested the vessel with AI present and stamped. Now we noticed the Client drawings call for the internal welds ground flush. Do we have to re-hydro the vessel if we just grind the welds...
  14. DCMV

    Repair Plate

    I am in Texas we have a contractor performing a NBIC repair on a coded vessel. The work was performed two weeks ago the AI signed the R1 today the name plate is being installed on the vessel after it was put in service. My question is is there any Code requirement that the AI witness the...
  15. DCMV

    NBIC repair or SECT 8

    We have a new exchanger bundle built to Sect8 Div1 by an out side supplier, there are two nozzles with pup piece welded on each. We the contractor will weld a new flange to one pup piece and a spool piece consisting of a 90 and flange to the other pup piece. My thought is that this would require...
  16. DCMV

    Valve body marking

    What does AC4 represent on Bonney valve body
  17. DCMV

    Helium leak test

    When is a helium leak test supposed to be done per asme sect VIII before or after expanding?
  18. DCMV

    Is Duplex2507 the same material as inco 825

    Is the material duplex 2507 considered the same material as Inco 825?u
  19. DCMV

    WPS/PQR

    We are Going to be making some strength welds on a tube to tube sheet joint we have a calculated min weld size of .053" and max weld size of .168". We submitted a wps and PQR to client welding engineer and it was returned as rejected. The client stated that the PQR has a specified min weld size...
  20. DCMV

    WPS

    During an In process inspection of supplier the third party inspector found the supplier using ER70S-6 instead of the WPS specified ER70S-2 filler metal. The supplier agreed to remove the S-6 and reweld with the required S-2. My question is will this be justified NCR on supplier? I know the S2...