Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations TugboatEng on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: MickeyD1
  • Content: Threads
  • Order by date
  1. MickeyD1

    Tail water elevations in HydroCAd

    If you have different variable tail water elevations corresponding to different storm events, can you use the same link node in HydroCAD? It seems like you should, as the elevation tab lets you select different events, however when as soon as I define a second event, it overwrites the first...
  2. MickeyD1

    Sanitary sewer pipe repair

    I am looking to put together a cost estimate for plans and specs for a sanitary sewer repair through lining of the pipe. The pipe size is 8-inches, but I am not sure what the material is. I am thinking that all that would be required is a plan sheet showing where the repairs are located, and...

Part and Inventory Search

Back
Top