Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: Matchess
  • Content: Threads
  • Order by date
  1. Matchess

    Sight Glass (EX area)

    Hi Is it possible to used Sight glass in ATEX area (Zone 1 group 2)? Glass is sometimes not recommended in EX area. A low conudctivity fluid (lubricating oil) will flow through the sight glass. This oil may be charger by a fine filtration upstream filter. I would like to avoid potential static...
  2. Matchess

    API 614 Why Metal mesh or stainless metal filter elements are not acceptable ?

    Hi Someone know why according to API 614 part 2 and 3 metal mesh is not acceptable for oil filtration ? 1.6.4.4 Metal mesh or stainless metal filter elements are not acceptable Regards
  3. Matchess

    DGS acceptable reverse pressure

    Hi I currently design an expander with a tandem dry gas seal. On the primary vent line (connected to flare)a Pressure control valve set at 3 barg is installed. This valve allowed to have always a minimum differential pressure across segondary DGS (required by DGS manufacturer). However, before...
  4. Matchess

    API 686 Max number 5 shim requirement

    Hi Someone know the technical reason about the maximum 5 shims requirement number under machine foot (potential untightening screw problem ?)specified in API686). same question about the maximum shim thickness of 12 mm ? Regards
  5. Matchess

    ASME B16.5 minimum nuts thickness

    Hi AMSE B16.5 recommend to use heavy hex. However it is only a reommmendation, is it possible to use hex (smaller nuts) and why ? What is the minimum nuts characterisics or size ?
  6. Matchess

    Dry gas seal, separation gas loss

    Hi I have Turbo generator with tandem dry gas seal and carbon ring on gearbox side. I would like to know, how long the machine can remain running in case of separation gas loss ? My concern is about DGS potential contamination by oil mist. In order to avoid oil migration (on DGS) is it...
  7. Matchess

    API 614 part 4 applicable for labyrinth and carbon ring sealing ?

    Hi Someone know if API 614 part 4 is applicable for labyrinth and carbon ring sealing or if it is only applicable for Dry gas seal ? Especially the requirements for seal gas and filter sizing. Regards Matchess
  8. Matchess

    Gas leak test, pressurized oil system

    Hi all, I design a pressuriez oil system for an expander-compressors (acc. to API614 firth edition annex G & API617 Part4) The operating pressure of the oil tank is > 60 barg with flammable gas. The design pressure of the seal gas oil system and compressor/expander/bearing casing is > 90 barg...
  9. Matchess

    Expander-compressors pressurized oil system, Gas leak test required ?

    Hi all, I design a pressuriez oil system for an expander-compressors (acc. to API614 firth edition annex G & API617 Part4) The operating pressure of the oil tank is > 60 barg with flammable gas. The design pressure of the seal gas oil system and compressor/expander/bearing casing is > 90 barg...
  10. Matchess

    Location PSV upstream or downtream a check valve blocked in closed position ?

    Good morning I am designing a lube oil system for a turbo expander This turbo expander is supplied with two oil pumps (1 for normal operation + 1 for back up) A check valve is placed dicharge line of each pump and I am asking if two PSV placed upstream of eash check valve are required to...
  11. Matchess

    Mawimum tolerated build up back pressure for a Rupture Disk

    Hi everybody I put a Non-fragmentable rupture disk device fitted in series with a conventional atmospheric pressure relief valve. I red in API 520 that place a pressure switch alarm between the rupture disk and the PRV is recommended.("rupture disk will not burst in tolerance if backpressure...

Part and Inventory Search