Dear All,
In one of the job I have to install emission sampling ports on stacks of boilers, furnaces and heaters . I have attached the standard clause with this thread.
First of all I need to understand where the sampling ports should be located. Is it 8 Diameters from the Top of the stack or...
Kindly define the word "Pressure Retaining Item" for pressure vessels.
What are the pressure retaining items for a typical pressure vessel?
Can support clips/rings for demister pad inside a pressure vessel be qualifed as pressure retaining itesms..??
Thanks and Regards..
I have a closed circuit cooling tower. In this tower water to be cooled comes, passes through the tubes, gets cooled and goes out.
These tubes are sprayed by water which is in continuous re circulation i-e water is sprayed on the tubes, gets collected in the basin, pumped again to the spray...
Is it possible to install demister pad in an existing vessel which does not have provision (internal attachment) before? What will be the most cost effective way?
Can a material e.g SA-516 GR 70 be specified for both HIC Resistance and NACE applicability at the same time?? if not then which is more stringent HIC Resistance Testing OR NACE Compatibility?
Regards,
In one of the jobs I have to specify a pump for domestic sewage transfer to waste water treatment plant. The Pump Flow is 290 USGPM and Required Head is 230 ft. The pump will take suction from an above ground Sewage Tank.
Here in Saudi Arabia, typically centrifugal non clog type impeller pumps...
In one of the jobs I have to specify a pump which will operate on 02 services. One service is HSRN (Heavy Straight Run Naphtha) and the second service is RCO (Reduced Crude Oil).
The Max Temperature for HSRN Case is 179 deg F and for RCO Case it is 588 deg F.
For HSRN case API Flush Plan 11 is...