Search results for query: *

  • Users: djr3203
  • Content: Threads
  • Order by date
  1. djr3203

    Generator Remote Start Signal Wiring - Class 1 Remote Control Circuit?

    Are the conductors for a 2-wire start signal for a generator considered a Class 1 remote control circuit per NEC?
  2. djr3203

    Insulation Breakdown of Polaris Splice

    I just ran by an issue where I have a 3phase, 100A disconnect feeding (2) 3phase, 50A disconnects that serve electric space heaters. The load side of the disconnect has (3) #2AWG feeding into a wire gutter where Polaris splices were used to splice down to (2) 50A feeders at #8AWG each going to...
  3. djr3203

    Relationship of Feeder Resistance, Voltage Drop, and Power Dissipated in a Circuit

    The new California Energy Code has adopted the fine print notes of the NEC for voltage drop. I am well aware of the undesirable affects of excessive voltage drop on circuits, especially motor loads (decrease in starting torque and overheating of the winding) but me and a coworker were wondering...
  4. djr3203

    NEC CB Size for Motor Loads

    NEC allows for a maximum 250% the FLA of a motor for an inverse-time CB. Is there somewhere in the NEC that allows you to use a 20A CB as the minimum CB size for protecting motors? As an example, I have a 1-1/2HP 460V, 3PH motor with an FLC of 3A. 3A x 2.5 = 7.5A, so does the circuit...
  5. djr3203

    Symmetrical vs. Asymmetrical Faults - Three Phase Bolted vs Line to Ground

    All, I have been a little unsure about this, so I was hoping the community could help clear it up for me. For a 3 phase, Wye distribution, I have read that a three phase bolted fault is a balanced fault and a single line to ground fault is an unbalanced fault. If a three phase bolted fault...
  6. djr3203

    Adding a Knock Out to an Existing Panel - Does it Void UL Listing?

    Hey All, Did a search and couldn't find a previous post... Does anyone know if it is acceptable to add a knock out to the side of an existing panel in which there is no more room on the top of the panel for a new conduit? Would doing this void the UL listing of the panel? Thanks for any...
  7. djr3203

    Arc Flash Reduction Maintenance Switch

    We have a project where we will be installing a new Eaton Magnum DS Low Voltage Switchgear with an arc flash reduction maintenance switch. 1. Does the maintenance switch set the main breakers to their lowest settings to reduce arc flash hazard while working on the gear? 2. If so, should the...
  8. djr3203

    Low Voltage Protective Device Arc Flash Analysis - Protective Device Bolted&Arcing Fault Current

    I am using SKM to perform a power system analysis (short circuit,coordination, and arc flash). When performing he arc flash calculations through the software per IEEE 1584, the table summary gives me the bus bolted fault current, bus arcing fault current, protective device bolted fault current...
  9. djr3203

    Reason for Motor Circuit Protector with Upstream OCPD?

    I tried to find a previous post that answered this question but had no luck. Please feel free to steer me in the correct direction if there is a previous post that covers this question: I am failing to see the reason for having a Motor Starter with a Motor Circuit Protector (MCP) when there is...
  10. djr3203

    Sputtering System Grounding

    I am working on a project where we are installing a sputtering system. The manufacturer is calling for us to drive (2) new ground rods (not bonded to the building ground electrode system) to ground the vacuum chamber. This ground will be in addition to a safety ground coming from the...
  11. djr3203

    Twisting of 1-Phase Branch Circuits

    Today I was looking at the as-built drawings for a physics lab that is adjacent to a lab I will be renovating. I noticed on the electrical plans that the engineer provided isolated/insulated grounds to all the receptacles and also called for the branch circuits to be twisted with a twist rate...
  12. djr3203

    3 Phase Voltage Drop - Wye vs. Delta Feeder to Panel

    I was under the assumption that for calculating voltage drop on a 3 phase, 4 wire (Wye) feeder from a distribution panel to a panel you only take into account the 1-way distance from the distribution panel to the panel because the assumption is the loads are balanced resulting in no current on...
  13. djr3203

    Extending UFER Ground

    I have a project where there is no ground bar in the existing electrical room and the grounding electrode from the UFER ground and water pipe was run directly to the ground bar in the main switchboard. We are redoing the electrical infrastructure and the main switchboard is being demolished and...
  14. djr3203

    Equipment Feeder from Adjacent Building

    I have a project with two laboratory buildings, side-by-side, with connecting hallways between the two buildings. One building was built a year later than the other in the 80s and over their life span the electrical system has been added onto so that now some of the equipment in one building is...
  15. djr3203

    12kV - 277/480V XFMR Work Clearance Requirement

    All, I have an existing electrical transformer room with (2) 12kV-277/480V transformers, and I am trying to determine if the room is compliant with NEC 2008. The room is rectangular with a single double door in the middle of the north wall of the room. The transformers sit on either side of...
  16. djr3203

    480V feeder through 12KV manhole

    Is it possible to have a 480V feeder run through a 12KV vault if you use 12KV cable? DJR
  17. djr3203

    Transformer Voltage Drop

    All, I am a junior engineer and I just received an email with a statement that I believe to be incorrect. Can you let me know what your thoughts are? Here is the statement: 'Transformer transfers energy thru magnetic induction coils and its associated turn ratio. There is no direct contact...
  18. djr3203

    Voltage Drop and Transformer

    I am a assisting a senior engineer on a project where we are renovating the emergency system of a commercial building. Due to the distances involved, the plan is to install a 1250KW/480V genset, step up to 12KV and then step back down to 480V in the electrical transformer room at the northwest...
  19. djr3203

    385KW PV System Design

    I am assisting a senior engineer on an installation of a PV system for one of our commercial projects. I have been given the task for calculating the voltage drop and I have a few concerns. The following is the basic outline of the design: - 4 separate PV arrays on different parts of the...
  20. djr3203

    Short Circuit Analysis Software

    I am looking into short circuit analysis software for low voltage to medium voltage distribution systems. Does anyone have any recommendations? Thanks. DJR