Hello All -
We are designing a water remediation system with 10,000 feet of 3/4" DR 11 HDPE. I've heard of stories of poor butt welds resulting in significant constriction in the pipe and headloss (rendering the pumps useless until the welds were fixed). I'm sure it was poor installation...