I'm assigned to size,design and create scope of work for a firewater pump package for a 3 storeys camp site and some other buildings. Also I need to size the required storage tank. Can anyone help me where can I start or what codes, standards or guidlines I can follow?
I'm working on a bid document for a chemical injection package and issue RFQ. I was wondering if anyone have a template or sample for scope of work or bid document so I can get some idea. It would be great if anyone can share his documents. Thank you.
Hello there,
Does anyone know that If I could put the wing valve, ESD valve and choke valve side by side??? Is there any process or mechanical problem of doing this? or any maintenance issue or isolation issue?? Any help would be great. Thanks.
Hello everyone,
I'm working on a gas injection project which the discharge design pressure from gas compressor is 38315 Kpa and design temperature is 170 deg C.Since it's sour we require 1.6 corrosion allowance. The discharge pipe size is 4" and it's going to an 8" header.I can't find any...
I'm looking for a rough estimate of corrosion rate for a 4" water pipeline in muskeg area. Is there any graph or reference that I can use for this application?
Water Properties:
pH 8.5
Chloride 1970 mg/L
TDS 4308 mg/L
Calcium 17.1 mg/L
Magnesium 7.5 mg/L
Sodium 1520 mg/L