Hi I need help from the expert. We are paralleling two genset in island mode with the same ratings,2kW 2400V, 3P, 60Hz. One genset (GA) uses open delta PT and
the other genset (GB) is using wye. If the common bus uses wye connected PT, what will be the phase shift if we sync GA
to the Bus? I...