Following a delay in the delivery of project bolts for a new gas processing plant under construction, our Contractor proposes the use of Low Alloy steel bolts galvanized bolts (A197 B7) with Carbon steel galvanized bolts (ASTM A325) for the clamping of piping supports.
Is there anyone...
Dear All,
We are in a big project where the sizes of pipes are very big 44", 54" and 64" with huge quantities.
Given the very tight schedule, the Contractor proposes us the use of TMCP plates for API 5L PSL2 LSAW Grade X60 welded pipes in ASME B31.3 as a process piping.