Hello,
I'm designing a tray tower 13 ft Dia and 0.875" thk. Due to some space constraint in the field, this tower needs to be cut into two halves. I need some insight for evaluating stress in the design of tailing lug for top section and trunnion for bottom section as these will be the open part...