Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: MISA
  • Content: Threads
  • Order by date
  1. MISA

    Tailings pipeline laing on the ground

    Our client want from us to analise tailings line CS(A 106 Gr.B) line 10" OD 1/2" rubber lined using Caesar II. Pipeline is 9 km long , heat traced and insulated in HDPE jacket. 3/4 Pipeline laying on the graveled ground. Pressure is 1,000 psi. Is anybody expirienced modeling line laying on the...

Part and Inventory Search