Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: Walter2992
  • Content: Threads
  • Order by date
  1. Walter2992

    Vertical In Line Pump Installed Horizontally

    I am Civil/Structural, but as an Owner's representative am involved with all aspects of building design and construction. We have a situation where a vertical in-line pump has been installed in a horizontal position. This is a 1/2 Hp pump that serves a primary boiler loop. The design flow is 48...
  2. Walter2992

    Geotechnical Bore Holes

    This may seem like a basic question, but I would like to get some information on the standard procedures for backfilling bore holes after the completion of the drilling. This is with respect to holes completed for foundation design, which are immediately filled after the test is complete. Are...

Part and Inventory Search