I am trying to find some clarification about the VT required for piping to ASME B31.3
ASME B31.3 - P 344.3.3 States that Visual examination shall be performed in accordance with ASME V Article 9.
ASME V - T-922 Knowledgeable and trained personnel having limited qualifications may be used to...
Hello,
I have an application that uses a hydraulic motor powered from a diesel engine.
There was a small leak on the hose connection to the pump which pretty much emptied the reservoir (pump was not used for about 2 months). The reservoir has now been topped up but the power output does not...
I'm sure this must have been covered somewhere but I can't find it.
I'm trying to find the exact engineering definition of a Generator and how it differs from an Alternator.
I am aware of two different definitions and I'm struggling to find which one is correct.
1) Generator is a generic term...
Hello,
I am designing a small 3" Gas control system. The media is wet biogas and the customer has requested a condensate trap situated before the main isolation valve.
Whenever we deal with biogas, we usually use a special filter (after the isolation valve) which includes a sump with a drain...
Hello,
We manufacture piping systems on skids for Natural gas up to about 20 bar and up to 8" pipe. For leakage and functionality testing we currently bolt on blank flanges with a 1/4" compression fitting for introducing compressed air to the inlet and outlet.
I am searching for some sort of...