  1. KangarooJoe

    Cross-bonding verification - reversing all links

    Hi, We are performing a cross-bonding verification on a 220KV cable circuit with 11 joint bays. The links and SVLs at all locations (termination link box and joint link boxes) have been placed in the normal service position. At the far end of the cable, we have connected the three cable...