I have two questions:
1. What would be a good value to assume for the shear modulus of a sandy clay?
2. Would you ever design a foundation without a geotech report?
Thanks in advance for your help.
I am trying to assist a client (owner) by reviewing the contractor's labor rates. A lot of the work is electrical and piping. I'm a structural guy and was hoping to get a little help from the group. Besides RSMeans, are there any other standards I can look to to verify the labor rates? Thanks...
I am trying to put together an estimate for a concrete repair project. The project consists of injecting concrete columns with an epoxy resin. RS Means shows a production rate of 80 lf per day. I need to estimate what percentage of the labor is spent on prepping the concrete, injecting the...
A contractor that I work with often recently completed construction on a mid-rise office tower. The final construction was completed approximately three months behind schedule, due to a variety of issues. The owner is trying to hold the contractor liable for lost revenues, while the contractor...
I usually just do buildings, but right now I am working on a light rail track slab. I would like some advice on constructability issues for the slab. The overall depth of the slab will be approximately 24". Should I design the slab as a monolithic pour or should I include a cold joint to the...
I am working on a bridge repair project, and the concrete does have a clear protective sealant on it. There is some discussion as to whether or not this is considered exposed. I am of the opinion that it is exposed to weather; others feel that since it has a sealant, it is not exposed. Which is...