Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. lightseeker123

    Tank Alteration/Modification

    Hi We are planning to add a 6"- 12" repad on the floor of a self supporting conical roof water storage tank. A point load will be connected at that location, away from critical heated affected zone. Do we need to conduct hydrotest after that. As per 9.3.3, pad can be added complying with NDE...
  2. lightseeker123

    Shorter Nozzle than API 650 requirement

    Hi Folks, We have hydro tested an API 650 tank and now thinking of cutting a nozzle length for shipping purpose, Is there a way we can extend it back to original length later on without a hydro test again. Relevant clause in API 650 is Per API 650 section 7.3.5, "after completion of the...
  3. lightseeker123

    Fire Suppression system for Pump station building

    Hi Folks, I am trying to figure what fire suppression system will be required for pump station building, 500-1500 sq. m covered area without water supplies (manned/unmanned), housing 4-6 crude oil pumps. NFPA 30, ch 18 - flammable and combustible liquid handling and transfer, seems very close to...

Part and Inventory Search