We install new grind ejector pump and still not able to suck/cut the tissue paper (raw or recycle). The tissue papers are floating and the pump is not sucking the tissue papers. Any suggestion?
My elevator contractor uses the steel deck to support the transformer and elevator controller and claims that the support will be embedded in the concrete when the concrete is poured.
How should I tell the contractor they are wrong and they have to remove the equipment and support the equipment...