I have a gas processing unit mounted on a giant ship. The vertical vessels (100' tall, 12' Dia) mounted on modular epxperiences waving angles with ocean waves. This vessel is filled with half liquid. Question:
1. How can supplier design this vessel per Div. 1?
2. Is this vessel to be considered...
For fatigue service reason, we call out vessel material to be normalized SA 516-70, and elipse heads (min thickness 2") get to be hot formed. The vessel fabricator proposes to use normalized plates to hot form the elipse heads and normalize the heads after.
My concern is if the mechanical...
For fatigue service reason, we call out vessel material to be normalized SA 516-70, and elipse heads (min thickness 2") get to be hot formed. The vessel fabricator proposes to use normalized plates to hot form the elipse heads and normalize the heads after.