I have a building with a wood roof bearing on a CMU wall. Conventional construction in the area connects a wood top plate to the top of the CMU wall with the pre-fabricated trusses bearing on the top plate.
ASCE 7 12.11.2 requires a "direct connection" capable of resisting an out-of-plane wall...