  1. gcbhhb

    Pavement planing asphalt overlay with chip seal base

    I am working on a pavement rehab project, that we will be pavement planing the asphalt to a certain depth (prefer 3" th) and placing an asphalt overlay (3"). We have received cores and have found that there is a chip seal base where some locations of the asphalt overlay is only 1-1/4" thick...
  2. gcbhhb

    Repair and overlay existing asphalt parking lot

    Good afternoon. I have a few existing parking lots that have a asphalt buildup varying between 2.25" to 4.5"+ and then one lot with an unknown thickness. The parking lots do have some cracks, but not too excessive. Areas that appear to be in failure will be receiving full depth repair. I have...
  3. gcbhhb

    is there a continuously running pump

    I need to continuously pump water from a large ditch. I will have water from the ditch flowing by gravity about 10-15cfs into a wet well which the pump will be placed in. I will then need to pump the water out of the wet well at between 10-15 cfs. This pump will run 24 hours a day for about...
  4. gcbhhb

    water mains - cap or plug

    Is there a difference or a rule of thumb on when to use a cap vs. a plug for at the end of a water main/fittings? thanks