While doing the demolition for a sidewalk replacement, the contractor uncovered an abandoned underground vault 6’ deep, projecting four feet from the building. The 6’ tall by 4’ wide opening from the vault to the basement was blocked in with 6” CMU set in a running bond. City requires that the...