Our office is in the process of designing a small tiltup with very low blast. Our question is with the roof. We are planning on using concrete over metal pan because the metal deck manufacturer does not have specs for blast. Has anyone crossed this path? Is there any design proceedures or...
With a structure entirely on drilled piers on a sloping site. Who is responsible for determining the top of the pier? The structural or the contractor?
Thanks