Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: bhalfweeg
  • Content: Threads
  • Order by date
  1. bhalfweeg

    IEEE 841 460V Motor Terminations

    Our plant unfortunately has some reasonably long motor cables (up to 800 m) for motors in the range of 30 HP to 100 HP resulting in quite large motor cables. Can anyone point me to a source for maximum cable termination sizes for IEEE 841 motors within this range? I am estimating the number of...
  2. bhalfweeg

    Mechanical Load Modelling

    I am in the process of developing a preliminary power system model for a new oil platform using the power system analysis package ERACS. As part of this model I'm looking to perform motor starting studies, which will require me to model the mechanical loads being driven by motors. Can anyone...
  3. bhalfweeg

    High impedance generation

    I'm investigating methods of managing fault level on an offshore installation with approximately 3 x 40 MW gas turbine generators. One option I am considering is increasing the sub-transient reactance of the turbo-generator. In speaking to turbo-alternator manufacturers, their basic response...
  4. bhalfweeg

    Offshore Power System Fault Level

    I'm looking at possible designs for the distribution system of a new offshore installation with a maximum load of 70 MW supplied by 3 x LM6000 42 MW GTs. This immediately presents a problem of available switchgear fault and normal current ratings, with typical metalclad switchgear restricted to...

Part and Inventory Search