When installing the temporary casing of H-pile, alluvial sand goes into the casing from the casing bottom and then makes the drill bit stuck. Boring cannot be continued. How would you solve the problem?
I am doing rehabilitation of a concrete structure. The plan is to chip of the existing concrete; and to expose the existing epoxy coated rebars and leave them in place; and then to pour the new concrete. Before pouring the concrete, how do I clean the epoxy coated rebars? I understand that for...
I am reviewing a caisson wall that is typical for shoring purpose (king caisson alternate with filler caisson).
Does anyone know the theory of how the filler caisson inter-lock with the king caisson? or how the caissons can act as a wall?
It would be great if anyone could provide me some...
I am reviewing a caisson wall that is typical for shoring purpose (king caisson alternate with filler caisson).
Does anyone know the theory of how the filler caisson inter-lock with the king caisson? or how the caissons can act as a wall?
It would be great if anyone could provide me some...