Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: lidabc
  • Content: Threads
  • Order by date
  1. lidabc

    Parking Lot Lighting Desgin

    I don't have design experience on parking lot lighting design. However, I was asked to review a parking lot lighting plan set to find out the areas to improve/optimize, e.g., reduce the number of lighting poles with different lighting fixtures, etc. I know it's an opportunity to extend my...
  2. lidabc

    NFPA 820 - CGD is required for Storm Pump Station?

    I am not familiar to NFPA 820 but I just found that the storm water pumping station wet well requires "CGD" if it is enclosed (Table 4.2). I have not seen CGD in "storm" water pump station but is it a "NEW" requirement? If it is a new requirement, is there any good product to recommend for the...
  3. lidabc

    2.5" deep AC & Overlay project

    I have an AC overlay project for an old Park parking lot. I checked as-built plans and found that the depth of the existing AC is only 2.5" deep. It gives me a concern that 1.5" deep grinding would "BREAK" the existing AC so it might cause repeating the same job in the near future. The owner...
  4. lidabc

    Storm pipes can be a part of a regional basin?

    Whenever I design storm drain basins, I come up with a question. Is it appropriate that storm drain pipes connected to a new basin can be included as a part of the basin capacity? Some municipalities say "No" for conservativeness, some say "OK". I know that conservative design of the basin...
  5. lidabc

    Starting HGL in the storm drain basin (pond)

    I don't have much experiences on storm drainage basin calculations. So it would be great to get some advices from the experts in this forum. A local storm drain specs includes the following criteria. "The starting point for hydraulic grade calculations in collection system design shall be the...

Part and Inventory Search