Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: rv13
  • Content: Threads
  • Order by date
  1. rv13

    erratic oil production

    well makes 50 b/d +/- oil -- 200+/- b/d water no gas next 2 days 4-5 b/d +/- oil --- 200 +/- water no gas well makes 50 b/d +/- oil --- 200+/- b/d water no gas this pattern has occured for over month the pattern used to be 4 days low oil production then one high for two months about 10 b/d...
  2. rv13

    gor/glr math

    i know i am not to smart so i would like someone to help if they would be so kind - to see if i am calculating correctly i am sure it is more complicated than below gor = mcf(gas)/bbl(oil) glr = mcf (gas)/bbl(liquid) 1700 mcf/day 950 bbls liquid 10 bbls oil gor = gor = scf/bbl glr = glr =...
  3. rv13

    plunger lift

    trying to determine how much it will help my cycles if I change my flow line from 2" to 3" and reduce my treater pressure
  4. rv13

    gas interference

    well has gone from 70 b/d to 50 b/d 65 mcf/d - would holding more back press on the tubing help - well seems to be flowing and pumping / one guy wants to run a larger pump - if in fact it is flumping I do not see how this will help the well is only been on pump for 6 months and flowed for about...
  5. rv13

    fluid levels cbm wells

    what would be the normal procedure to obtain a fluid level in a cbm well - using the echometer and a belief in the accuracy of the information thank you
  6. rv13

    shooting fluid levels - obtaining down hole information esp wells

    we are shooting fluid levels on esp wells with echometer differences i should expect from normal rod pumped well any differences in procedures and problems i should expect ? thank you

Part and Inventory Search