Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: LuffyD
  • Content: Threads
  • Order by date
  1. LuffyD

    NFPA 59A Fuel Gas service within LNG plant

    NFPA 59A requires 30%RT butt welds ( above -29C) as per 9.7.3.2 (B) Pressure piping operating above ?20°F (?29°C) shall have 30 percent of each day’s circumferentially welded pipe joints nondestructively tested over the entire circumference, in accordance with ASME B 31.3. 1- is Fuel Gas...

Part and Inventory Search