I am working on a HEC-RAS analysis for a roadway widening project where we will be adding a second bridge downstream of the existing bridge. The existing bridge will remain in place. The HEC-RAS model for the existing bridge did not include ineffective flow areas, so I am updating the model...
I am a relatively new ICPR user, and had 2 questions regrading model setup for a project. The project only has one basin, and there are 2 subareas.
In existing conditions, the site is undeveloped (i.e., no pipes, channels, ponds, etc.). Therefore, I have 2 nodes (one for each subarea) - and I...