I am designing a 22' x 66' residential foundation on 25% slope of soil having 40% silt (yuk) mixed with sand & gravel. (Haven't done soil test drilling yet) Plan on pouring slab-on-grade beam (12"x30") sitting on 12" dia x 18' deep piers with belled ends spaced 10' apart.
At one end, below...