Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: Schneidly
  • Content: Threads
  • Order by date
  1. Schneidly

    Under reinforced CMU bearing/shearwalls

    I am evaluating an existing CMU building in Seismic Design Category D. The building is shape of an upside down T where the horizontal leg is 60FTx162FT with a roof height of 12FT-8IN (8IN walls) and the vertical leg is 76FTx152FT (12IN walls). See attach Plan. There are no interior shearwalls...
  2. Schneidly

    Construction Joints in a water containing structures

    I am in charge of the construction management of a 35ft x 111ft water containing structure. The bottom slab is 43.5ft x 119.33ft with 2 keyed, water stopped construction joints at third points of the length. The client wants a continuous poured slab. He states they did an aeration basin in a...
  3. Schneidly

    Drag Strut connection to existing sttel roof deck

    I am looking at installing a drag strut in an existing CMU building. The roof consists of a 1 ½” deep 18 gage steel roof deck spanning perpendicular to the new drag strut. The roof joists are “16H5” spanning 27ft at 6ft oc. I have to install the drag strut from under thus the fasteners would go...
  4. Schneidly

    Deflection of CMU beam

    I need to some help with checking the deflection of a 14ft long CMU 12” beam. My total DL is 446 plf. LL (roof) is 566 plf. I am limited to 24 IN depth. I have seen l/600 as a limit, but I believe this is for the design of a member supporting brick or unreinforced CMU. What is a reasonable...
  5. Schneidly

    Out-of-plane at openings

    I am evaluating an existing 8IN CMU structure that is partially grouted with #5 at 24”. I wanted to know how to determine how much wall I can use on either side of an opening for the out-of-plane check. There are 8ft-8Iin, 5ft-4in and 3ft-4in openings. The walls are 13ft-4in tall. The openings...
  6. Schneidly

    1979 UBC

    I only have access to the 1985 UBC. I need to know if the 1979 UBC required masonry reinforcing to be at a minimum of 4 ft OC as described ion Section2407 (h) B. Page 157 (1985 UBC). Thanks
  7. Schneidly

    2010 AISC Specification for Structural Steel Buildings

    When is the 2010 AISC Specification for Structural Steel Buildings going to be available? What is the purpose behind the new edition? Are they reformatting? Changing design procedures? When will the 2010 be adopted? I am looking at getting a reference that is current to that edition and I am...
  8. Schneidly

    Notes for core drilling existing concrete

    I have a project where requiring the core drilling of several walls. The cores will 34IN in diameter. I also have a hole that will have a diameter of 54IN. That is a big hole to core. I believe the contractor will need to special order a drill or drill several smaller holes in a circle and go...
  9. Schneidly

    Placing a concrete beam under existing suspended slab

    I have a question in another less active part of the forum. http://www.eng-tips.com/viewthread.cfm?qid=274095 I was hoping to get some input on how to detail a pair of reinforcement beams for a 3ft x3ft saw cut opening in a 12" thick existing suspended slab. The existing slab has a 16ft span...

Part and Inventory Search