For Trip Coil monitor and Close coil monitor we use a Protection relay Input (high Impedance) wired in parallel to the Tripping relay output contacts, and in series with the Trip/close coil and the 52a/b status.
Has anyone ever had issues where the relay input (125VDC control voltage) would not...
If I can't find the CT Thermal Rating Factor TRF (or Rating Factor RF) on the nameplate, is there a way to find that knowing the CT class? In other words, how can I come up with a TRF if I do have the CT nameplate data and saturation curves.
Station that I am doing settings for has this 1960s...
The zero sequence network for an Auto TX and for a Yg/Yg transformer both show that there is no connection to the ground bus (No), which means there will be no 0seq current flowing through that circuit (unless there is a Delta tertiary which does connect to the ground bus in the 0seq network)...
I am setting a GE D60 relay and trying to get some clarification on what the intent is for this OFFSET setting and how to set it. I usually use SEL relays. The GE manual doesn't go in detail about this setting. I do not have series compensated lines. Any help would be appreciated. Attached below...
I have a customer that has recently installed a 4.75 MVA distribution transformer (23/4.2kV)that comes on a skid that also has a recloser, regulators, and isolation/bypass switches. I have fuses protecting the transformer on the high-side. The only trips on the transformer were for 63FPX (Sudden...
I have to implement a Transformer Case Ground protection on a 5MVA Delta (23)/Wye (grounded)(4.2) transformer. The transformer has no high side breaker, only Fuses; Low side has a recloser. I have never used this scheme before.I have included an IEEE excerpt about the TCG protection below. What...
A customer provided me transmission line impedance for a 69KV line in matrix format. He got it from ETAP. I am used to of getting impedances in R1+jX1 and Ro+jXo format which is exactly what I input into ASPEN. Can someone please help me with reading or decyphering these matrices to obtain my...
I am planning to take the PE exam this fall in NC, and I was wondering if anyone from NC knows where the PE preparation classes are held. I am in Charlotte, NC.
Thanks
I have no experience with fuses (other than some fuses on radial distribution lines); I need some help coming up with the fuse size to protect a 3.75/4.68 MVA distribution Transformer. The fuses obviously are on high side (Delta 23kV) and the low side is Wye-grounded 4.16kV. I have looked into...
I have an old relay settings file that is referrring to the 'Winter DAL'rating (given as 32MVA) and has the Inverse Time-overcurrent element pickup set above it. Can someone explain this a little bit. I searched online and I saw apost saying that you shouldnt load the line for more than 5 mins...
I have a Virginia Transformer 42MVA 69/13KV. There are two CTs- one on the B phase of High side winding and one on the B-phase Low side winding. These CTs are wired to the Transformer Monitor relay and I am guessing that these are meant for Hot Spot calculations. So, any confirmation on what...
Hey guys,
Is it appropriate to turn Stage 2 fans on instead of stage 1 fans juts to keep the wear out of the fans even.
Customer wants to toggle between Stage 1 and Stage 2 fans when a signal is received asking for Stage 1 fans to turn on. So when a signal is received for Stage 1 fans, I will...
I have a Grounded Wye - Grounded Wye txfmr with delta tertiary (tertiary used for station service). My question is - Do I need a ground relay on the High side? For a Low side ground fault, will my High side see Zero seq current? If it will, would it be the same as what the low side sees?
What...
I have some GE relays and their Serial #s and want to know how to find which firmware version is in them? I don't have the relays with me, the customer has 'em.
Have a solidly grounded fuseless capbank, and for protection settings I am following the IEEE standard guide C37.99-2000 . I have a double wye connection with 5 strings in each leg of the wye. So 5 in left wye for each phase, and 5 in the right Wye for each phase. I am getting a little confused...