I have two gensets feeding a manual 3-pole xfer switch. It feeds an MDP which then feeds 8 SDPs. All 5 wire. 3-phase 4-wire and 1 Equipment grounding conductor. Genset 1 is bonded ,the other is not per the NEC. I have checked for an internal bond at genset 2 but dont get a continuity reading...