I am a setting out engineer and am being pushed more towards construction aspect of engineering at work(used to be civils) and was looking for advice on the best/easiest way to plumb up steel columns prior to grouting.I Am ok with aligning them onto grid.
Being pushed more towards construction aspect of engineering at work(used to be civils) and was looking for advice on the best/easiest way to plumb up steel columns prior to grouting.I Am ok with aligning them onto grid.
looking for advice on best or most accurate accurate way of transferring existing control points onto upper levels of buildings as construction proceeds .