If the pile toe levels has been exceeded by more than 500mm or so, what is the best rectification for this:
I have thought about a few options but advise would be great:
* pour in concrete to the toe level
* do nothing as the desirable toe level has been passed and therefore has met the piling...
I am putting together a SIMOPs plan. does anyone have a template and a plan already done so that I can read and use as an example. in addition does anyone have a SIMOPs matrix, or matrix of permissible operations (MOPO) template, inlcuding description?
Hi There,
We are currently using an air back pressure control valve for our air line. However, I would like to know if I can use the same valve model for water. I have to temporarily hook up a pressure regulating valve for water to reduce the line pressure from 800kpa to 650kpa and since we...
We currently have a (3")air diaphragm pump running at 42m3/hr
We want to install a second air diapghram pump (total flow 80m3/hr), but after further investigation I found that I needed to put in a pulsation damper for each pump because I will now have 2 pumps in parrallel and may cause an...
I am looking into the positioning of lances for the injection of NiCl2 into the FBR. Currently the lances are positioned near the top of the fluidised bed, but the intention is to lower them an additional 400mm down from the original position,with a reduction of inclanation of approx 8 degrees...
I have a pipe vibration issue. Each time the submersible pumps starts the stainless steel pipe vibrates. I have two static mixers, which I can not remove. They are required because we have found that although removing the mixers has more or less eliminated vibration, it has affected the chemical...